Skip to main content

NX15 Handling & Soldering

This page provides handling and soldering guidance for NX15 module assembly.

NX15 is an SMT LGA module. Handle it as a moisture-sensitive and ESD-sensitive component during storage, placement, reflow, and inspection.


Storage Conditions

ConditionSpecification
Storage temperature5°C to 35°C, unopened
Storage humidity20% to 70% RH, unopened
Shelf life12 months from shipment date
MSL levelMSL 3
Floor life≤168 hours at <30°C / <60% RH
Baking125°C +5/-0°C, 24 hours, one time max
Corrosive atmosphereAvoid Cl2, NH3, SO2, or NOx
caution

Track floor life after opening the moisture barrier bag. If the floor life is exceeded, follow the baking requirement before assembly.


Handling Rules

RuleReason
Use ESD protectionPrevent electrostatic damage
Avoid touching padsPrevent contamination and soldering issues
Inspect before assemblyCheck cracks, pad damage, or abnormal surface condition
Use vacuum pickupPick up from the top surface only
Avoid mechanical stressPrevent module or solder joint damage

Reflow Profile Summary

ZoneTemperatureDuration
Preheat25°C to 150°C60–120 s
Soak150°C to 200°C60–120 s
Reflow peak≤260°CMax 30 s above 250°C
Cooling260°C to 25°C<6°C/s ramp-down
Number of reflowsMaximum 2 times
caution

Do not exceed the recommended reflow conditions. Excessive heat or repeated reflow can damage the module or degrade RF performance.


Cleaning

Cleaning is not recommended.

Ultrasonic cleaning or liquid immersion may damage internal components or degrade RF performance.

Cleaning MethodRecommendation
Ultrasonic cleaningNot recommended
Liquid immersionNot recommended
Aggressive solventNot recommended
No-clean processPreferred when compatible with production process

Inspection After Reflow

After reflow, inspect the assembly before powering the board.

CheckPurpose
Module alignmentConfirm module is placed correctly
Solder bridgeCheck for shorts between pads
Pad wettingConfirm solder joints are formed properly
Cracks / damageCheck mechanical damage
Antenna areaConfirm no unexpected metal or contamination near antenna
Power shortCheck VDD-to-GND resistance before power-on

First Power-On After Assembly

Use a current-limited power supply during the first power-on.

StepAction
1Inspect board visually
2Check VDD-to-GND resistance
3Set current limit
4Apply power
5Measure VDD_nRF
6Try SWD connection
7Flash or run basic firmware
8Verify BLE advertising or debug output

Production Notes

ItemRecommendation
MSL trackingRecord opening time and floor life
Reflow countDo not exceed maximum reflow count
ESD controlUse ESD-safe workstations and packaging
TraceabilityTrack lot code and date code
ProgrammingKeep SWD access available for production
TestInclude power, programming, and BLE verification tests